Q2 financial figures from GEA
Engineering for a better world

GEA increases order intake and profitability in Q2 2025

01
Man walking through server room
Engineering for a better world

Afgezien van de firewall: beveiligen wat het belangrijkst is bij GEA

02
Engineering for a better world

Smart, stylish, circular: Polycotton recycling with Circ

03
About GEA
Over ons

Doelgerichte engineering

GEA is een van ‘s werelds grootste leveranciers voor de voedingsmiddelen-, dranken- en farmaceutische industrieën. Ons portfolio bevat machines en installaties, evenals geavanceerde procestechnologie, onderdelen en uitgebreide services. We laten ons leiden door een sterk gevoel van doelgerichtheid en onze ruim 18.000 toegewijde medewerkers werken hard om de duurzaamheid en efficiëntie van productieprocessen wereldwijd te verbeteren.
image showing a graph of a stock

Statement for the half year 2025

test

Engineering for a better world

We ontwikkelen duurzame oplossingen voor een betere wereld en om de duurzaamheidsdoelstellingen van onze klanten te ondersteunen. Bovendien bevorderen we de hoogste milieu- en sociale standaarden op onze eigen locaties en bij de aanbesteding. We zetten ons in om de meest aantrekkelijke werkgever in de werktuigbouwkundige industrie te worden met meer diversiteit, gelijke kansen en integratie, door langdurige carrièreperspectieven te bieden. Om deze ambities concreet te maken, hebben we meetbare ESG-doelstellingen als onderdeel van GEA’s Mission 26-strategie gedefinieerd.
Meer ontdekken
Careers
Vacatures

Zorg voor een positieve impact

Ben je nieuwsgierig, enorm gemotiveerd en los je graag uitdagingen voor klanten op? GEA zoekt gepassioneerde mensen voor diverse functies.
GEA globe

GEA increases order intake and profitability in Q2 2025; upgrades guidance for full year 2025

GEA once again achieved increases along all key financial performance metrics in the second quarter of 2025, including a significant improvement of the EBITDA margin before restructuring expenses. “Our continued strong performance in the second quarter underlines the excellence of our global teams and our strategic clarity. We operate in resilient markets and have set the right priorities with our efficiency and transformation programs,” said CEO Stefan Klebert.

GEA CEO Stefan Klebert and Ali Al-Ali, Chairman of Baladna Algeria, at the contract signing at the Congress International Centre in the Algerian capital Algiers. ( (Photo: Baladna / GEA)

GEA mandated to build world’s largest integrated dairy facility in Algeria

At a formal event in Algiers, Baladna, a leading Qatari dairy and food producer, the Algerian Government, and GEA – represented by CEO Stefan Klebert – took part in a contract signing ceremony, enabling the construction of the world’s largest integrated dairy farm and milk powder facility in Algeria. GEA was mandated to provide a comprehensive range of dairy farming and processing solutions. This project is one of the largest single orders for GEA to date. Milk powder production is planned to commence in late 2027, with gradual scale-up of production volumes over subsequent years.

Arrow up

GEA opens New Food technology center in the U.S. to boost alternative proteins’ scale-up

GEA officially opened its New Food Application and Technology Center (ATC) in Janesville, Wisconsin, on July 17, 2025. The USD 20 million facility is the company’s second global Center of Excellence dedicated to alternative proteins and sustainable food solutions as alternatives to traditional foods such as meat, dairy, seafood and eggs. GEA’s first ATC was launched in Hildesheim, Germany, in 2023. The new facility expands the GEA Janesville campus, which has served as a site for production, repair, logistics, and training since 2024.

Ontvang nieuws van GEA

Blijf op de hoogte van GEA’s innovaties en verhalen door je in te schrijven op nieuws van GEA.

Hulp nodig?

Wij zijn er om je te helpen! Met slechts een paar gegevens kunnen we je vraag beantwoorden.