
The Senior Project Manager – BL Dairy (Separation) is responsible for end-to-end execution of dairy separation plants and separation skids, incorporating GEA separators, valves, pumps, homogenizers, and associated automation. The role requires strong mechanical, electrical, and instrumentation knowledge along with the ability to interpret PFDs, P&IDs, mechanical layouts, piping isometrics, and electrical drawings. The role involves leading customer communication, supplier coordination, erection planning, commissioning, and internal stakeholder alignment.
Lead execution of full dairy separation plants, including separator systems and integrated process units.
Manage fabrication and delivery of separation skids (separator modules, valve clusters, pump units, homogenizer skids).
Define execution plans, schedules, resource needs, and commissioning milestones.
Ensure integration of separators with process lines, utilities, automation, and plant interfaces.
Interpret PFDs, P&IDs, separation process diagrams, equipment layouts, and skid drawings.
Review mechanical GA drawings, piping isometrics, and utility connections.
Understand electrical schematics, control panel drawings, wiring diagrams, MCC/VFD connections, loop drawings, and instrumentation layouts.
Act as the main customer interface for all dairy separation plant and skid execution activities.
Lead technical discussions, progress reviews, and scope clarifications.
Ensure customer expectations are met and proactively manage issues.
Manage suppliers responsible for separation skid fabrication and assembly.
Coordinate erection and commissioning agencies for plant installation.
Conduct FAT for separation skids and review technical compliance.
Monitor quality, safety, and on-time delivery.
Work with Engineering, Separation Application teams, SCM, Manufacturing, Quality, Automation, and Finance.
Ensure timely availability of drawings, BOMs, documentation, and material.
Oversee installation of separators, valves, pumps, homogenizers, and associated equipment.
Support automation integration and functional testing.
Conduct SAT, commissioning, performance testing, and ensure complete customer handover.
Bachelor’s degree in Mechanical, Electrical, or Industrial Engineering.
5–8 years of experience in dairy separation or hygienic equipment execution.
Strong knowledge of separators, valves, pumps, homogenizers, and separation plant processes.
Ability to read PFDs, P&IDs, mechanical, electrical & instrumentation drawings.
SAP or ERP experience preferred.
Willingness to travel to customer sites.
GEA 是食品和饮料加工行业最大的供应商之一,它还为许多其他加工行业提供服务。超过 60 个国家/地区的大约 18,000 名员工都为 GEA 的成功做出了重要贡献 – 快来加入我们!我们提供充满趣味和挑战的任务、与国际团队共处的积极工作环境以及在全球性公司成长和发展的个人机遇。

GEA 职业
GEA 获得欧洲杰出雇主调研机构认证为杰出雇主。我们在领导力、道德与诚信以及可持续发展方面表现优异。

GEA 职业
我们是一家全球工业工程公司,也是世界上食品、饮料和制药等行业最大的系统供应商之一。GEA 在世界各地提供令人振奋且多样化的培训和职业机会。

GEA 职业
GEA 的历史可以追溯到 140 多年前。如今,我们在富有弹性的客户行业开展业务,拥有超过 18,000 名敬业的员工,并与 150 多个国家/地区开展业务。