Trade press release

Höchst Industrial Park: Carbon capture pilot plant goes into operation – project by Infraserv Höchst and GEA

June 11, 2025

The carbon capture pilot plant was connected to Infraserv Höchst's sewage sludge incineration plant, one of the largest and most modern of its kind in Germany. ©Infraserv GmbH & Co. Höchst KG, 2025

The carbon capture pilot plant was connected to Infraserv Höchst's sewage sludge incineration plant, one of the largest and most modern of its kind in Germany. ©Infraserv GmbH & Co. Höchst KG, 2025

The carbon capture pilot plant was officially handed over during a press conference on June 11, 2025. The photo shows Julia Keller, Head of Commercial Carbon Capture Solutions, GEA, Michael Schneider, R&D Engineer Carbon Capture Solutions at GEA, Dr. Joachim Kreysing, Managing Director of Infraserv Höchst, and Dr. Sirko Ogriseck, Project Manager at Infraserv Höchst (from left to right). ©Infraserv GmbH & Co. Höchst KG, 2025

The carbon capture pilot plant was officially handed over during a press conference on June 11, 2025. The photo shows Julia Keller, Head of Commercial Carbon Capture Solutions, GEA, Michael Schneider, R&D Engineer Carbon Capture Solutions at GEA, Dr. Joachim Kreysing, Managing Director of Infraserv Höchst, and Dr. Sirko Ogriseck, Project Manager at Infraserv Höchst (from left to right). ©Infraserv GmbH & Co. Höchst KG, 2025

Dr. Michael Golek

CONTACT

About GEA

GEA 是食品加工行业及众多工业领域的领先供应商之一,2019 年的销售总额约达 49 亿欧元。

Stay informed!

Are you a journalist? Then sign up to our press mailing list and select the topics you would like to be informed about

Media Relations

GEA Group Aktiengesellschaft
Peter-Müller-Str. 12
40468 Düsseldorf
Germany
pr@gea.com